Transportation and Logistics Center #123
About the property
🚆 General Description of the Transportation and Logistics Center
This large transportation and logistics center is located on a 51.2-hectare site with well-developed rail and warehouse infrastructure. The total length of the railroad tracks is 15 km, of which 8 km are currently in operation and 7 km are included in the development plan.
The complex’s handling capacity exceeds 100,000 TEU per year. Simultaneous storage capacity exceeds 8,000 TEU. The facility is directly connected to the station tracks and has a loading/unloading front capable of handling up to 80 standard railcars.
📦 Terminal and Warehouse Infrastructure
Container terminal
Warehouse infrastructure—44,000 m²
Customs warehouse—6,450 m²
Refrigerated container connection and service area
Bulk cargo transshipment terminal with a capacity of over 500,000 metric tons per year
Cross-docking area
Storage areas for wheeled and oversized equipment
Loading ramps for loading and unloading passenger cars from specialized railcars
🏭 Industrial Zone
The project includes 30 hectares of land designated for export-oriented industrial production facilities with access to utilities and transportation infrastructure. Potential sectors include agricultural processing, compound feed production, oilseed and grain processing, the production and packaging of mineral fertilizers, and other industrial projects.
⚙ Services Provided
Terminal handling and storage of loaded and empty containers
Connection and servicing of refrigerated containers
Customs warehouse and temporary storage facility services
Customs and brokerage support
Transshipment of bulk cargo into containers
Loading and unloading operations for rail and road transport
Handling and storage of various types of cargo
Organization of routine repairs to railcars and containers
Cross-docking
📈 Project Development Phases
2023 – Launch of the container terminal
2023–2024 – Development of the freight village / dry port concept
2025–2026 – Establishment of an industrial zone
2026–2027 – Construction of Class A warehouses
Long-term expansion of the industrial zone to 200 hectares
Modernization and development of the railway sorting yard
The project is focused on creating a multimodal logistics hub that integrates container, warehouse, and industrial infrastructure.
Key parameters
- Total area
- 44 000 m²
- Building class
- A
- Deal type
- Rent
- Property type
- Dry
- Status
- BTS project
Location
Almaty Region, Ili District